Worked district · issued 5 September 2026 · base date 1 April 2026

Blaby District, question by question.

The second district, evaluated on the same measures in the same order — and it answers the first question the other way. On the trajectory published with its Regulation 19 plan the Council is marginally above five years. On its own consenting record it is not, and on its own delivery projection the gate opens next year whatever the supply figure says.

What follows is the summary. The full analysis runs to forty-five pages with every source cited, and is sent on request.

The conclusion, in four figures §01 · summary
5.09
years at 1 April 2026 on the published trajectory, a surplus of 63.5 dwellings — and 4.58 when that trajectory is re-timed on the Council's own register
53.5%
the 2027 delivery measurement on the Council's own trajectory; 70.6% in 2026. Both below 75%
67.2%
of what the adopted plan projected was delivered — and 5.9% of the capacity of its own two site allocations, six years on
13.7%
of assessed affordable need met across the five years of the assessment period
Question one

Is the gateway open, and will it still be?

5.09 years at 1 April 2026 on the published trajectory and the Council's own arithmetic, 654 a year plus 5% — above five by 63.5 dwellings across the whole window.

That is the position before any site is examined, and it is stated first. The margin is 12.7 dwellings a year, 1.8% of the requirement, and it rests entirely on allocations that do not yet hold permission: committed supply alone returns 3.02 years, and on the apportionment of Leicester's unmet need that the Council's own agreed instruments establish, 3.76.

4.58Years when the same trajectory is re-timed on the Council's own consenting record — 3,144 dwellings against 3,434, 290 short. Across the observed range, 4.52 to 4.58; on the district's own approval period, 4.71. None reaches five
3.02Years on committed supply alone. It never reaches five at any base date the trajectory supports, from 2.14 to 3.07
3.76Years on the 346-a-year share of Leicester's unmet need fixed by two jointly agreed instruments of June 2022; the Council's evidence carries 115
4.46Years at a 20% buffer, the position that follows any measurement below 85%
2.78The Council's own last published figure, struck at 31 March 2025 and 366 days old at the base date. The April 2026 update it undertook to publish has not appeared
2.451The figure the Council agreed in a signed statement of common ground at inquiry, 24 days before it published 2.78
86%The 2025 delivery measurement, published 17 August 2026: an action plan is required. The 165 completions of 2024–25 were the lowest of ten years
70.6 → 53.5%The 2026 and 2027 measurements on the Council's own trajectory. Below 75%, Annex D deems an evidenced unmet need to exist for policy S5(1)(j)

The two triggers run in opposite directions, and that is what decides a case. On the published trajectory the supply figure rises at every later base date. The delivery measurement falls at each, because the requirement has moved to local housing need and the completions already banked are the lowest in a decade.

Both S5(1)(j) triggers, projected from the authority's own published figures
Base datePublished trajectory, 5%At 20% Re-timed on its register, 5%Gateway on supply
1 April 20265.094.464.58Shut on the trajectory; open re-timed
1 April 20275.755.035.45Shut
1 April 20285.715.005.97Shut
Open — below five years, S5(1)(j) engaged on supply Shut — five years demonstrated

The delivery trigger is where this district's case sits. The 2025 measurement is 86% and carries an action plan. On the Council's own trajectory 2025–26 delivers 254 against the 306 needed to stay above 75%, so the 2026 measurement returns 70.6% and the 2027 measurement 53.5%. Below 75%, Annex D paragraph 12(c) deems an evidenced unmet need to exist — S5(1)(j) engaged on delivery alone, at every base date in the table above.

Stated against our own case On the unadjusted trajectory the Council is above five years at every base date it supports, and the site rows cast to the printed annual totals in all seventeen years: no argument is available that the near-term supply is overstated on the face of the plan. The 2025 measurement carries an action plan and nothing more, and no consequence follows from the 2026 or 2027 figure until it is published. The district also determines faster than the national median — the four permissioned allocations took a mean of 25.3 months from validation to grant against the 34 the published research puts at their size — and on the district's own approval period rather than the national one the re-timed position rises to 4.71. Still below five; but that input runs for the Council, and it is volunteered.
Question two

Is that supply deliverable?

56.0% of the window supply rests on outline permission — 1,958 of 3,497 dwellings, and 835 of those have no reserved-matters application on the register.

Consent stage governs delivery. Where an allocation carries a live application its phasing gives way to the application's own dates, and every period the register records in this district is slower than the one the chain assumes.

551 of 1,383Allocated dwellings in the window that cannot deliver a first completion before it closes, on published medians and each site's own date. Removing only those takes the position from 5.09 to 4.29
411Dwellings in the window on allocations with no application at all — 11.8% of the window supply. The largest is a 760-dwelling site the trajectory has delivering from 2027–28
613Allocated dwellings in the window that hold permission: 17.5%. A further 399 rest on an undetermined application
272Dwellings on four outline sites with neither a reserved-matters application nor a start, on which Annex B puts the burden of clear evidence on the Council
331 daysMedian from validation to committee resolution on seventeen resolutions to grant since January 2024, against the 91 the Procedure Order sets. The fastest took 167
197 daysMedian from resolution to decision notice on sixteen permissions, against the 147 the chain assumes. Twelve of the sixteen exceed it
271 daysMedian from outline notice to reserved-matters approval on five outlines, against the 183 the chain allows. Every one exceeds it
25.3 mthsMean from validation to grant on the four permissioned allocations. A site with no validated application today cannot realistically complete inside the window
Stated against our own case Fourteen of the seventeen resolutions to grant since July 2024 have become permissions, and the three outstanding are the three most recent: there is no pipeline of overrunning resolutions in this district, only a consenting period, and it is measured. The register also carries 966 dwellings the trajectory does not; on the Council's own build rate 314 of them fall inside the window, and they are added, not left out. Every timing input in the chain sits at the generous end of the published evidence — 147 days where the district's median is 197, 183 where it is 271, and the plan's own build rate of 40 a year in every band.
Question three

Does the plan distribute soundly?

67.2% of what the adopted plan projected across seven years was delivered: 2,466 dwellings against 3,671. Its own two site allocations, 5.9% of capacity six years on.

The emerging trajectory does not meet its own requirement until its tenth year, and the two standalone strategic sites the plan rests its second half on contribute nothing to the first nine.

9 of 17Plan years in cumulative deficit against the plan's own requirement, peaking at 740.6 dwellings in 2027–28. 48.1% of the seventeen-year total falls in the last seven years
10.1%Of the combined 20% small-and-medium-sites target in national plan-making policy; 8.8% on the one-hectare limb the examination will apply
19.5%Take-up of the capacity the Council's own assessment identifies — 7,310 of 37,415 dwellings across twenty settlements. Three settlements with 700 dwellings of capacity are allocated nothing
0.76%Of plan-period supply placed in the four Smaller Villages: 99 dwellings across seventeen years, 19 of them in the first five
0Dwellings from the two standalone strategic sites in the first nine years — 1,765 inside the plan period, 7,900 beyond it
155 a yearWhat the adopted plan's Strategic Growth Area has delivered against 266 projected, never above 197. The emerging trajectory enters the same site at 180 a year for fifteen consecutive years
91.7%Of the trajectory's 240 non-zero site-year cells are exact multiples of five; 37.5% are exactly 40. Default rates, not schedules obtained from those who must build
Every tierRests on a named Policy S4 allocation, the Smaller Villages included — the converse of the Harborough position, and the reason policy S6 turns here on what each made plan contains

That last point is the mirror of the Harborough finding. S6(1)(b) of the Framework published on 17 August 2026 asks whether a made neighbourhood plan contains allocations to meet its identified housing requirement; the December 2024 test asked for policies and allocations, and the word has gone. In Harborough the Local Plan gives its two lowest tiers no site to carry. Here every tier is provided for by a named allocation a neighbourhood plan can adopt — but the one made plan covering the Smaller Villages, the Fosse Villages plan, provides for housing by existing commitments and development within settlement limits, and allocates no site. A proposal in Sharnford or Thurlaston conflicting with it does not attract S6. It falls to S3: S4 within the settlement, S5 outside, and where the Council cannot demonstrate five years, S5(1)(j) in terms.

What this does not say It does not read the other four made plans — Blaby, Leicester Forest East, Cosby and Glenfield — and whether any contains allocations is left open. Nor is the emerging plan said to be unsound. It is at Regulation 19 and will be examined against the December 2024 Framework, so the diverse-mix target now in force is not the one it will be tested on; that is stated, and it runs for the Council.
Question four

Is affordable need being met?

13.7% of assessed affordable need delivered across the five years of the assessment period — 367 dwellings against 2,680, a shortfall of 2,313.

The assessed need is 536 a year, 157% of the district's standard method figure, and the Council's own topic paper calls it “particularly significant in Blaby”. Across thirty-four published years the district has added 65.4 affordable dwellings a year; the best single year reached 29.3% of that need.

536Affordable dwellings a year assessed in the evidence the Council itself relies on, 341 of them for rent — 426 households a year in or falling into need, against a relet supply of 85
40Gross affordable additions in 2024–25, the second weakest year of the last twenty. The “significant increase” the topic paper relies on was 133, one year earlier
35.5%Of the assessed need the whole plan-period trajectory would yield at the policy minimum of 25% — and the plan's own viability evidence recommends 20% below 200 homes
£9,000Gap between the income needed to rent privately and to buy at the lower quartile. 12.9% of households sit inside it, second only to Harborough in the housing market area
10Wholly affordable consents in ten years, 342 units, 34.2 a year: 6.4% of the assessed need. One came forward on the plan's own rural exception route
+97%Reported gross homelessness expenditure in a single year, £560k to £1.102m
141Children in temporary accommodation in the District at 31 March 2026, in 59 of 93 households. Nearly half of that accommodation is nightly paid and privately managed, against 37.9% for England
75 plotsSelf-build demand the Council recorded outstanding in May 2024. In November 2025 an Inspector recorded it “failing to meet its statutory duty”, undisputed
What this is not Assessed need is not a housing requirement, and no figure here is offered as one. The Council's own affordable series in its topic paper does not reconcile to the published national series and is not used; one published basis is carried per table. No causal claim is made from the homelessness figures: they evidence the cost, not the cause.
The record

What the Inspectorate has already recorded.

2.45 years — the lowest figure the Council has put, agreed in a signed statement of common ground at inquiry. In 2021 it put 7.1.

Nothing in this part is our figure. Each entry is what the decision letter records. The last decision in which the Council put five years was 10 November 2023; the first in which it did not was 27 March 2024, four months later, and every decision since has recorded a shortfall.

14 v 7Decisions recording a shortfall, against decisions recording five years or more — the change falling between November 2023 and March 2024
14 daysBetween the Council agreeing 2.451 years in a statement of common ground and telling a different Inspector the position was 3.50 to 3.53. A discrete question for the Council, flagged rather than deployed
2 of 5Most recent decisions allowed, the balance engaged in all five. The three dismissed failed on design, on location and on Local Green Space — not one on supply
3 of 5Of those decisions engage the statutory self-build duty — one records the Council failing in it, in terms the Council did not dispute
The full analysis

You have read the summary. The evaluation is the document.

Everything above is stated without its working. The full evaluation carries the arithmetic behind every figure, the trajectory row each was drawn from, and the notes recording what was done to it and what was deliberately left alone.

It is sent on request, to named recipients. We ask who you are because the document cites live positions that move, and we would rather be able to tell you when one has.

  • 45pages, covering all four questions and the Inspectorate's record in full
  • 28sections across six parts, twenty-seven carrying a table and notes
  • 27measures of the twenty-eight on the register, each with its benchmark and basis; the one not carried is stated
  • 35substantive applications on the register, 4,344 dwellings, read with the minutes of every Planning Committee since January 2024
  • 3schedules of sources — authority documents, national policy and data, and conventions
  • 0figures carried from an unpublished source
How it was built

One trajectory. Read row by row.

Every figure of supply comes from a single document — the housing trajectory published with the Regulation 19 plan, as considered at Full Council on 30 June 2026 — and it is built from the individual site rows rather than the printed annual totals. The rows were cast against the totals in all seventeen years before anything was derived from them, and they agree in every one. Application status is the Council's own register, read to 2 September 2026, with the minutes of every Planning Committee since January 2024.

Published figures are recorded as published, including where they do not reconcile. Where a point tells against the client it is volunteered rather than waited for, and identified as such where it arises. Forty-five pages, twenty-eight sections, three schedules of sources, and no figure carried from an unpublished one.

What extends

The method is national.

Nothing in the four questions is particular to Blaby. The sections carry the same names in the same order as in Harborough, so that a reader can lay the two side by side; the one section this district's evidence does not support is omitted, and the omission is stated.

That comparison is the point. One district is short on the face of its own schedule; the other is marginally above five years on the face of its plan and short on its own register. Both turn on the same evidence, and any authority in England can be taken to the same depth. What varies is how much of its evidence base it has published, and that is established before anything is quoted.

Commission this for your authority.

An initial report sets out all twenty-eight measures. It is then kept current — re-cut quarterly, or on request whenever a position moves. Pricing turns on how much of the evidence base the authority has published, so tell us the authority and we will quote.

Contact us →